Substation Scout

Bollinger, MO interconnection queue

4 active projects totaling 800 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4active projects
800active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2691 Not reported 345 250 Hybrid Active
J1519 Not reported 345 200 Solar Active
J2265 Not reported 345 200 Hybrid Active
J3504 Not reported 161 150 Solar Withdrawn
J3505 Not reported 161 150 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first