Substation Scout

MISO request J3505

MISO queue ID J3505

Queue request J3505 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Bollinger County, MO, according to Berkeley Lab’s queue data file. The filing names 5HERITAGE - 5FREDTN as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2028.

Queue IDJ3505
Project nameNot reported
Status (as published)Active
Substation5HERITAGE - 5FREDTN
Point of interconnection5HERITAGE - 5FREDTN 161.0kV
CountyBollinger
StateMO
Voltage161 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

5HERITAGE - 5FREDTN substation: 2 requests in the MISO queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
J3504Not reported150SolarWithdrawn

Bollinger, MO: 5 requests in the MISO queue, 4 active totaling 800 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2023 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner