MISO request J1519
MISO queue ID J1519
Queue request J1519 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Bollinger County, MO, according to Berkeley Lab’s queue data file. The filing names St. Francois to Lutesville as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2025.
| Queue ID | J1519 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | St. Francois to Lutesville |
| Point of interconnection | St. Francois to Lutesville 345 kV |
| County | Bollinger |
| State | MO |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2025-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Bollinger, MO: 5 requests in the MISO queue, 4 active totaling 800 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN MISSOURI |
|---|---|
| Cluster | DPP-2020 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2020-06-18 |
| Interconnection agreement date | 2025-06-19 |