Home / MISO / Counties / Bolivar, MS
Bolivar, MS interconnection queue
3 active projects
totaling 360 MW in the MISO queue, plus 5 with terminal status (shown grayed).
3 active projects
360 active MW
8 total filed
Queue ID Project kV MW Resource Status
J3629
Not reported
115
210
Hybrid
Withdrawn
J3541
Not reported
n/r
150
Solar
Withdrawn
J2287
Not reported
115
135
Solar
Active
J2751
Not reported
n/r
125
Solar
Active
J2768
Not reported
115
120
Solar
Withdrawn
J3092
Not reported
n/r
115
Hybrid
Withdrawn
J2736
Not reported
115
100
Hybrid
Withdrawn
J3186
Not reported
115
100
Hybrid
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.