MISO request J2287

MISO queue ID J2287

Queue request J2287 was listed in the MISO interconnection queue at the end of 2025 as a 135 MW solar project in Bolivar County, MS, according to Berkeley Lab’s queue data file. The filing names DELTA SES SWITCHYARD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2024.

Queue IDJ2287
Project nameNot reported
Status (as published)Active
SubstationDELTA SES SWITCHYARD
Point of interconnectionDELTA SES SWITCHYARD 115kV
CountyBolivar
StateMS
Voltage115 kV
Capacity135 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bolivar, MS: 8 requests in the MISO queue, 3 active totaling 360 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-09-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.