Beauregard Parish, LA interconnection queue

6 active projects totaling 1,376 MW in the MISO queue, plus 21 with terminal status (shown grayed).

6active projects
1,376active MW
27total filed
Queue IDProjectkVMWResourceStatus
J2911 Not reported 230 810 Hybrid Withdrawn
J2882 Not reported 230 410 Hybrid Withdrawn
J3939 Not reported 230 386 Solar Active
J2310 Not reported n/r 300 Solar Withdrawn
J2884 Not reported 230 276 Hybrid Withdrawn
J2020 Not reported 230 260 Hybrid Withdrawn
J2441 Not reported 138 250 Solar Withdrawn
J2505 Not reported 138 250 Solar Withdrawn
J3295 Not reported 230 250 Solar Withdrawn
J4201 Not reported n/r 250 Hybrid Active
J1282 Not reported 230 200 Solar Withdrawn
J1380 Not reported 230 200 Solar Withdrawn
J1424 Not reported 230 200 Solar Active
J2860 Not reported 138 200 Solar Withdrawn
J2942 Not reported 230 200 Solar Withdrawn
J4092 Not reported 138 200 Solar Active
S1123 Not reported 230 200 Battery Active
J2500 Not reported 138 175 Battery Withdrawn
J2543 Not reported 138 175 Battery Withdrawn
J3026 Not reported 138 175 Battery Withdrawn
J3582 Not reported 138 150 Hybrid Withdrawn
J4188 Not reported 230 140 Solar Active
J1634 Not reported 230 100 Solar Withdrawn
J2802 Not reported 230 100 Solar Withdrawn
J2169 Not reported n/r 98.9 Solar Withdrawn
J3609 Not reported 138 93.1 Hybrid Withdrawn
J1997 Not reported 138 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.