Substation Scout

MISO request J4092

MISO queue ID J4092

Queue request J4092 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Beauregard Parish, LA, according to Berkeley Lab’s queue data file. The filing names Deridder - Longville as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2030.

Queue IDJ4092
Project nameNot reported
Status (as published)Active
SubstationDeridder - Longville
Point of interconnectionDeridder - Longville 138.0kV
CountyBeauregard Parish
StateLA
Voltage138 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Beauregard Parish, LA: 27 requests in the MISO queue, 6 active totaling 1,376 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCLECO POWER
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first