MISO request J4201

MISO queue ID J4201

Queue request J4201 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW hybrid project in Beauregard Parish, LA, according to Berkeley Lab’s queue data file. The filing names Cole as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 24, 2029.

Queue IDJ4201
Project nameNot reported
Status (as published)Active
SubstationCole
Point of interconnectionCole
CountyBeauregard Parish
StateLA
VoltageNot reported
Capacity250 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2029-08-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Beauregard Parish, LA: 27 requests in the MISO queue, 6 active totaling 1,376 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCLECO POWER
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-09-30
Components (hybrid)Solar 250 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.