4 active projects totaling 495 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4active projects
495active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1808 Not reported 161 200 Solar Active
J3433 Not reported 161 115 Solar Withdrawn
J3523 Not reported 161 115 Battery Active
J4127 Not reported n/r 100 Solar Active
J3198 Not reported n/r 80 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.