Barron, WI interconnection queue
4 active projects totaling 495 MW in the MISO queue, plus 1 with terminal status (shown grayed).
4active projects
495active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1808 | Not reported | 161 | 200 | Solar | Active |
| J3433 | Not reported | 161 | 115 | Solar | Withdrawn |
| J3523 | Not reported | 161 | 115 | Battery | Active |
| J4127 | Not reported | n/r | 100 | Solar | Active |
| J3198 | Not reported | n/r | 80 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.