Substation Scout

Arkansas, AR interconnection queue

7 active projects totaling 1,021 MW in the MISO queue, plus 15 with terminal status (shown grayed).

7active projects
1,021active MW
22total filed
Queue IDProjectkVMWResourceStatus
J2631 Not reported 230 250 Solar Withdrawn
J3511 Not reported 230 250 Solar Withdrawn
J3457 Not reported 230 215 Solar Active
J3435 Not reported 230 210 Solar Withdrawn
J1215 Not reported 230 200 Solar Active
J3058 Not reported n/r 200 Hybrid Active
J2574 Not reported 230 172 Hybrid Withdrawn
J2759 Not reported 230 170 Solar Active
J1309 Not reported 115 129.9 Solar Withdrawn
J3615 Not reported 115 125 Solar Withdrawn
J3616 Not reported 115 125 Battery Withdrawn
J654 Not reported n/r 101.5 Solar Withdrawn
J348 Not reported 115 81 Hybrid Operational
J2009 Not reported 230 80 Battery Withdrawn
J2562 Not reported n/r 80 Solar Withdrawn
J2986 Not reported 115 80 Solar Active
J2010 Not reported 230 75 Solar Active
J2341 Not reported 230 75 Solar Withdrawn
J1245 Not reported 230 50 Battery Withdrawn
J393 Not reported n/r 49 Solar Withdrawn
J2006 Not reported 230 40 Battery Withdrawn
J2994 Not reported 115 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first