Substation Scout

Hopkins, KY interconnection queue

2 active projects totaling 213 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

2active projects
213active MW
4total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2023-007 Not reported 161 138 Solar Active
LGE-GIS-2018-006 Not reported 161 120 Solar Withdrawn
LGE-GIS-2019-020 Not reported 161 85 Solar Withdrawn
LGE-GIS-2024-002 Not reported 69 75 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first