LG&E and KU queue ID LGE-GIS-2023-007

Queue request LGE-GIS-2023-007 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 138 MW solar project in Hopkins County, KY, according to Berkeley Lab’s queue data file. The filing names Earlington North Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDLGE-GIS-2023-007
Project nameNot reported
Status (as published)Active
SubstationEarlington North Substation
Point of interconnection161kV Earlington North Substation
CountyHopkins
StateKY
Voltage161 kV
Capacity138 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hopkins, KY: 4 requests in the LG&E and KU queue, 2 active totaling 213 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
ClusterTCS 2024
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2023-08-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.