LG&E and KU request LGE-GIS-2024-002

LG&E and KU queue ID LGE-GIS-2024-002

Queue request LGE-GIS-2024-002 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 75 MW gas project in Hopkins County, KY, according to Berkeley Lab’s queue data file. The filing names 2MADSNV LP W to 2 EARLINGTN N line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2027.

Queue IDLGE-GIS-2024-002
Project nameNot reported
Status (as published)Active
Substation2MADSNV LP W to 2 EARLINGTN N line
Point of interconnection2MADSNV LP W to 2 EARLINGTN N 69 kV line
CountyHopkins
StateKY
Voltage69 kV
Capacity75 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hopkins, KY: 4 requests in the LG&E and KU queue, 2 active totaling 213 MW.

Tracked changes

Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityLouisville Gas & Electric and Kentucky Utilities Energy
ClusterTCS 2024
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)LGIA Signed
Queue date2024-02-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.