Tap WALLIS_S65_8 - GEBHRT_X65B8 Ckt#65 substation interconnection queue

2 active projects totalling 196.3 MW in the ERCOT queue.

2active projects
196.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0226 Pamplona Storage 138 153.9 Battery SS Completed, FIS Completed, No IA
26INR0229 Pamplona Solar 138 42.4 Solar SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.