Tap WALLIS_S65_8 - GEBHRT_X65B8 Ckt#65 substation interconnection queue

2 active projects totalling 196.3 MW in the ERCOT queue.

2active projects
196.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0226 Pamplona Storage 138 153.9 Battery SS Completed, FIS Completed, No IA
26INR0229 Pamplona Solar 138 42.4 Solar SS Completed, FIS Completed, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.