Tap Buckhorn Switch - Brown Switch substation interconnection queue

2 active projects totalling 409.9 MW in the ERCOT queue.

2active projects
409.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0430 Clapton Storage 345 208.9 Battery SS Completed, FIS Started, No IA
26INR0238 Clapton Solar 345 201 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.