Live Oak AEP substation interconnection queue

2 active projects totalling 210.6 MW in the ERCOT queue.

2active projects
210.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0364 Cashel BESS 138 150.4 Battery SS Completed, FIS Started, No IA
27INR0261 Tipperary Solar 69 60.2 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.