Winkler, TX interconnection queue

2 active projects totalling 216.8 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

2active projects
216.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
23INR0071 BRP Volans BESS 138 206.9 Battery SS Completed, FIS Started, No IA
19INR0031 Bestla Solar n/r 180 Solar Inactive
25INR0711 Coyanosa Gas 25 9.9 Gas In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.