Uvalde, TX interconnection queue

9 active projects totalling 1,097.8 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

9active projects
1,097.8active MW
11total filed
Queue IDProjectkVMWResourceStatus
25INR0195 Photo Solar 2 138 300 Solar SS Completed, FIS Started, No IA
21INR0334 Nightfall Solar 138 180.9 Solar SS Completed, FIS Completed, IA
24INR0122 PHOTO BESS 2 138 150 Battery SS Completed, FIS Started, No IA
25INR0194 Photo Solar 1 138 150 Solar SS Completed, FIS Started, No IA
23INR0205 SUNSETTER BESS 138 100 Battery SS Completed, FIS Started, No IA
24INR0380 Photo BESS 3 138 100 Battery SS Completed, FIS Started, No IA
24INR0121 PHOTO BESS 1 138 75 Battery SS Completed, FIS Started, No IA
28INR0188 Ashra Solar SLF 69 40.3 Solar SS Completed, FIS Started, No IA
20INR0024 Fluorite Solar n/r 25 Solar Inactive
20INR0013 Basalt Solar n/r 20 Solar Inactive
28INR0190 Ashra Storage SLF 69 1.6 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.