Substation Scout

Throckmorton, TX interconnection queue

6 active projects totalling 960.6 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

6active projects
960.6active MW
8total filed
Queue IDProjectkVMWResourceStatus
21INR0263 Monarch Creek Wind 345 283.4 Wind SS Completed, FIS Completed, IA
26INR0316 Lonesome Dove BESS n/r 256.1 Battery Inactive
26INR0326 Leaning Tree BESS n/r 256.1 Battery Inactive
30INR0123 Sideoats Solar 1 345 167.6 Solar SS Started, FIS Started, No IA
30INR0124 Sideoats Solar 2 345 167.6 Solar SS Started, FIS Started, No IA
30INR0125 Sideoats Solar 3 345 167.6 Solar SS Started, FIS Started, No IA
26INR0327 Sleepy Hollow BESS 138 123.1 Battery SS Completed, FIS Completed, No IA
25INR0558 Ayass BESS 69 51.3 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.