Substation Scout

Stonewall, TX interconnection queue

3 active projects totalling 798.8 MW in the ERCOT queue.

3active projects
798.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
26INR0269 Moccasin Solar 345 603.6 Solar SS Completed, FIS Completed, IA
28INR0253 Stonewall BESS 138 135 Battery SS Completed, FIS Started, No IA
27INR0242 Stonewall Solar 69 60.2 Solar SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.