Roberts, TX interconnection queue

1 active project totalling 250.7 MW in the ERCOT queue.

1active projects
250.7active MW
1total filed
Queue IDProjectkVMWResourceStatus
29INR0341 Pampa Natural Gas n/r 250.7 Gas SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.