Live Oak, TX interconnection queue
5 active projects totalling 322.6 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
5active projects
322.6active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0292 | Urca Solar | n/r | 204.1 | Solar | Inactive |
| 25INR0621 | Anagram Solar | 138 | 130.6 | Solar | SS Completed, FIS Started, No IA |
| 22INR0467 | Bird Dog Energy Storage | 69 | 60.4 | Battery | SS Completed, FIS Completed, IA |
| 23INR0487 | Brightside Solar Alt POI | 138 | 50 | Solar | SS Completed, FIS Not Started, IA |
| 27INR0375 | Buck Ranch Solar SLF | 69 | 40.8 | Solar | SS Completed, FIS Started, No IA |
| 27INR0376 | Buck Ranch Storage SLF | 69 | 40.8 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.