Live Oak, TX interconnection queue

5 active projects totalling 322.6 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

5active projects
322.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
24INR0292 Urca Solar n/r 204.1 Solar Inactive
25INR0621 Anagram Solar 138 130.6 Solar SS Completed, FIS Started, No IA
22INR0467 Bird Dog Energy Storage 69 60.4 Battery SS Completed, FIS Completed, IA
23INR0487 Brightside Solar Alt POI 138 50 Solar SS Completed, FIS Not Started, IA
27INR0375 Buck Ranch Solar SLF 69 40.8 Solar SS Completed, FIS Started, No IA
27INR0376 Buck Ranch Storage SLF 69 40.8 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.