Lavaca, TX interconnection queue

1 active project totalling 310.2 MW in the ERCOT queue.

1active projects
310.2active MW
1total filed
Queue IDProjectkVMWResourceStatus
27INR0091 Oak Tree Energy Storage n/r 310.2 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.