Kimble, TX interconnection queue

1 active project totalling 306.4 MW in the ERCOT queue.

1active projects
306.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
25INR0653 Southfork Energy Storage 345 306.4 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.