Kimble, TX interconnection queue

1 active project totalling 306.4 MW in the ERCOT queue.

1active projects
306.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
25INR0653 Southfork Energy Storage 345 306.4 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.