Substation Scout

Hunt, TX interconnection queue

8 active projects totalling 1,195.6 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

8active projects
1,195.6active MW
9total filed
Queue IDProjectkVMWResourceStatus
28INR0327 18-BRAVO BESS 138 407 Battery SS Completed, FIS Started, No IA
27INR0461 Fermata BESS 345 204 Battery SS Completed, FIS Started, No IA
26INR0464 Ceres BESS 138 202.7 Battery SS Completed, FIS Started, No IA
25INR0371 McMurtre Storage n/r 176.1 Battery Inactive
22INR0281 Pink Solar SLF 138 152.4 Solar SS Completed, FIS Started, IA
27INR0489 Power Lane II Gas 138 104.4 Gas SS Completed, FIS Started, No IA
25INR0246 VALDIVIAN SOLAR 138 74.9 Solar SS Completed, FIS Started, No IA
22INR0425 MAKALU SOLAR 138 50.2 Solar SS Completed, FIS Started, No IA
29INR0293 Pink Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.