Dimmit, TX interconnection queue

12 active projects totalling 1,294.1 MW in the ERCOT queue.

12active projects
1,294.1active MW
12total filed
Queue IDProjectkVMWResourceStatus
26INR0555 Desert Palm BESS 138 201.3 Battery SS Completed, FIS Started, No IA
26INR0556 Wintergarden BESS 138 201.2 Battery SS Completed, FIS Started, No IA
26INR0356 Saluga Ranch Storage 138 125.4 Battery SS Completed, FIS Started, No IA
27INR0330 Wild Horse Desert Solar 138 120 Solar SS Completed, FIS Started, No IA
27INR0373 Velado Solar SLF 138 115.2 Solar SS Completed, FIS Started, No IA
27INR0374 Velado Storage SLF 138 115.2 Battery SS Completed, FIS Started, No IA
25INR0133 Rose Quartz BESS 138 101.4 Battery SS Completed, FIS Completed, No IA
27INR0208 Sugarloaf BESS 138 100.6 Battery SS Completed, FIS Started, No IA
27INR0331 Wild Horse Desert Storage 138 90.3 Battery SS Completed, FIS Started, No IA
29INR0107 7L Solar SLF 69 71.6 Solar SS Completed, FIS Started, No IA
23INR0164 Steppe Reserve Storage 138 51.9 Battery SS Completed, FIS Started, No IA
29INR0108 7L Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.