Substation Scout

Collin, TX interconnection queue

5 active projects totalling 971.8 MW in the ERCOT queue.

5active projects
971.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
25INR0101 Drake BESS 138 257.3 Battery SS Completed, FIS Completed, IA
25INR0238 Little Ridge Storage 138 252 Battery SS Completed, FIS Started, No IA
25INR0391 Purple Sage BESS 1 345 156 Battery SS Completed, FIS Completed, IA
25INR0392 Purple Sage BESS 2 345 156 Battery SS Completed, FIS Completed, IA
24INR0274 Bufflehead BESS 138 150.5 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.