7 active projects totalling 2,303.6 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

7active projects
2,303.6active MW
9total filed
Queue IDProjectkVMWResourceStatus
29INR0035 Cavell Wind 345 641.2 Wind SS Completed, FIS Started, No IA
29INR0034 Cavell Solar 345 502.1 Solar SS Completed, FIS Started, No IA
25INR0460 Acker BESS 345 301 Battery SS Completed, FIS Completed, IA
19INR0175 Shifting Gale Wind n/r 289 Wind Inactive
27INR0143 Ogalalla Storage 345 251.6 Battery SS Completed, FIS Started, No IA
20INR0050 Castro Solar 345 224.7 Solar SS Completed, FIS Started, IA
16INR0049 Nazareth Solar 345 203 Solar SS Completed, FIS Completed, IA
23INR0015 Scarlet Solar 345 180 Solar SS Completed, FIS Started, No IA
16INR0033 Hart Wind (Old POI) n/r 165 Wind Inactive

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.