Calhoun, TX interconnection queue

4 active projects totalling 849.6 MW in the ERCOT queue.

4active projects
849.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
26INR0019 HyFuels Green Lake Solar 138 347 Solar SS Completed, FIS Started, No IA
27INR0466 Wolfram Storage 138 206.6 Battery SS Completed, FIS Started, No IA
20INR0266 Tres Bahias Solar 138 195 Solar SS Completed, FIS Completed, IA
23INR0123 Vaca Storage 138 101 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.