Burnet, TX interconnection queue
2 active projects totalling 228.1 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).
2active projects
228.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0313 | Backbone Creek BESS | 138 | 124.1 | Battery | SS Completed, FIS Completed, IA |
| 26INR0499 | Mineral Springs BESS | 138 | 104 | Battery | SS Completed, FIS Started, No IA |
| 27INR0125 | RedSun BESS | n/r | 84 | Battery | Inactive |
| 27INR0124 | RedSun Solar | n/r | 82.6 | Solar | Inactive |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.