Briscoe, TX interconnection queue

5 active projects totalling 2,459.7 MW in the ERCOT queue.

5active projects
2,459.7active MW
5total filed
Queue IDProjectkVMWResourceStatus
29INR0031 Commodus Wind 345 641.4 Wind SS Completed, FIS Started, No IA
29INR0030 Commodus Solar 345 502.1 Solar SS Completed, FIS Started, No IA
29INR0397 Black Mountain Briscoe Gas 345 495.3 Gas SS Started, FIS Started, No IA
23INR0330 BRP Snowdon BESS 345 410.9 Battery SS Completed, FIS Started, No IA
28INR0023 Silverton Solar 345 410 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.