Queue request FC100382 was listed in the Duke Energy interconnection queue at the end of 2025 as a 265 MW gas project in Osceola County, FL, according to Berkeley Lab’s queue data file. The filing names Intercession City Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2030.
| Queue ID | FC100382 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Intercession City Substation |
| Point of interconnection | Intercession City 230 kV Substation |
| County | Osceola |
| State | FL |
| Voltage | 230 kV |
| Capacity | 265 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Intercession City Substation substation: 5 requests in the Duke Energy queue, 3 active totaling 827 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 3 | Not reported | 297 | Gas | Operational |
| FC100386 | Not reported | 265 | Gas | Active |
| 15 | Not reported | 368 | Gas | Withdrawn |
| 38 | Not reported | 368 | Gas | Withdrawn |
Osceola, FL: 23 requests in the Duke Energy queue, 7 active totaling 1,726.8 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Florida |
|---|---|
| Developer | Duke Energy Florida, LLC |
| Cluster | Cluster: 2025 Annual DEF FERC Cluster; Cluster Sub Group: Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Queue date | 2025-12-12 |