Osceola, FL interconnection queue

7 active projects totaling 1,726.8 MW in the Duke Energy queue, plus 16 with terminal status (shown grayed).

7active projects
1,726.8active MW
23total filed
Queue IDProjectkVMWResourceStatus
142 Not reported n/r 616.6 Solar Withdrawn
4 Not reported 230 537 Gas Active
15 Not reported n/r 368 Gas Withdrawn
72 Not reported n/r 340 Gas Operational
FC100382 Not reported 230 265 Gas Active
FC100386 Not reported 230 265 Gas Active
74 Not reported n/r 170 Gas Operational
325 Not reported n/r 74.9 Solar Active
326 Not reported n/r 74.9 Solar Active
165 Not reported n/r 74.5 Solar Withdrawn
191 Not reported n/r 74.5 Solar Withdrawn
193A Not reported n/r 74.5 Solar Withdrawn
203A Not reported n/r 74.5 Solar Withdrawn
203B Not reported n/r 74.5 Solar Withdrawn
207 Not reported 230 74.5 Solar Withdrawn
226 Not reported n/r 74.5 Solar Withdrawn
301 Not reported n/r 74.5 Solar Withdrawn
302 Not reported n/r 74.5 Solar Withdrawn
279 Not reported n/r 74.3 Solar Withdrawn
280 Not reported n/r 74.3 Solar Withdrawn
133 Not reported n/r 14.4 Other Withdrawn
121 Not reported n/r 11.8 Other Withdrawn
132 Not reported n/r 11.2 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.