Intercession City Substation substation interconnection queue

3 active projects totaling 827 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

5 Duke Energy queue filings name Intercession City Substation as the point of interconnection, all in FL.

3active projects
827active MW
5total filed
Queue IDProjectkVMWResourceStatus
15 Not reported n/r 368 Gas Withdrawn
38 Not reported n/r 368 Gas Withdrawn
3 Not reported 230 297 Gas Operational
FC100382 Not reported 230 265 Gas Active
FC100386 Not reported 230 265 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.