Anclote Substation substation interconnection queue
3 active projects totaling 219 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).
7 Duke Energy queue filings name Anclote Substation as the point of interconnection, all in Pasco County, FL.
3active projects
219active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 109 | Not reported | n/r | 1,400 | Gas | Withdrawn |
| 110 | Not reported | n/r | 1,400 | Gas | Withdrawn |
| FC100009 | Not reported | 230 | 199 | Battery | Active |
| 53 | Not reported | n/r | 10 | Gas | Operational |
| 55 | Not reported | n/r | 10 | Gas | Operational |
| 52 | Not reported | n/r | 9 | Gas | Withdrawn |
| 54 | Not reported | n/r | 9 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner