2 active projects totaling 493.1 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).
6 Duke Energy queue filings name Hudson Substation as the point of interconnection, all in Pasco County, FL.
2active projects
493.1active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 93 | Not reported | n/r | 650 | Gas | Withdrawn |
| 5 | Not reported | 230 | 480 | Gas | Operational |
| 129 | Not reported | n/r | 400 | Other | Withdrawn |
| 77 | Not reported | n/r | 345 | Gas | Withdrawn |
| 116 | Not reported | n/r | 220 | Other | Withdrawn |
| FC100000 | Not reported | 115 | 13.1 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.