Duke Energy request 977914

Duke Energy queue ID 977914

Queue request 977914 was listed in the Duke Energy interconnection queue at the end of 2025 as a 80 MW solar project in Columbus County, NC, according to Berkeley Lab’s queue data file. The filing names MARION - WHITEVILLE - EASTERN as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID977914
Project nameNot reported
Status (as published)Active
SubstationMARION - WHITEVILLE - EASTERN
Point of interconnectionMARION - WHITEVILLE 230KV - EASTERN
CountyColumbus
StateNC
Voltage230 kV
Capacity80 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

MARION - WHITEVILLE - EASTERN substation: 2 requests in the Duke Energy queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
890899Not reported75SolarWithdrawn

Columbus, NC: 9 requests in the Duke Energy queue, 2 active totaling 102 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2025 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.