Columbus, NC interconnection queue
2 active projects totaling 102 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
2active projects
102active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 66858 | Not reported | 115 | 700 | Solar | Withdrawn |
| 977914 | Not reported | 230 | 80 | Solar | Active |
| 569188 | Not reported | 230 | 75 | Solar | Withdrawn |
| 890899 | Not reported | 230 | 75 | Solar | Withdrawn |
| 920645 | Not reported | n/r | 75 | Solar | Withdrawn |
| 566856 | Not reported | 230 | 60 | Solar | Withdrawn |
| 977788 | Not reported | 115 | 22 | Other | Active |
| 886387 | Not reported | 115 | 21.9 | Other | Withdrawn |
| 5037 | Not reported | 115 | 2 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.