Columbus, NC interconnection queue

2 active projects totaling 102 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

2active projects
102active MW
9total filed
Queue IDProjectkVMWResourceStatus
66858 Not reported 115 700 Solar Withdrawn
977914 Not reported 230 80 Solar Active
569188 Not reported 230 75 Solar Withdrawn
890899 Not reported 230 75 Solar Withdrawn
920645 Not reported n/r 75 Solar Withdrawn
566856 Not reported 230 60 Solar Withdrawn
977788 Not reported 115 22 Other Active
886387 Not reported 115 21.9 Other Withdrawn
5037 Not reported 115 2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.