MARION - WHITEVILLE - EASTERN substation interconnection queue

1 active project totaling 80 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2 Duke Energy queue filings name MARION - WHITEVILLE - EASTERN as the point of interconnection, all in Columbus County, NC.

1active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatus
977914 Not reported 230 80 Solar Active
890899 Not reported 230 75 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.