Substation Scout

Duke Energy request 977864

Duke Energy queue ID 977864

Queue request 977864 was listed in the Duke Energy interconnection queue at the end of 2025 as a 5 MW solar project in Florence County, SC, according to Berkeley Lab’s queue data file. The filing names OLANTA as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID977864
Project nameNot reported
Status (as published)Active
SubstationOLANTA
Point of interconnectionOLANTA 230KV
CountyFlorence
StateSC
Voltage230 kV
Capacity5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

OLANTA substation: 9 requests in the Duke Energy queue, 2 active totaling 10 MW.

Queue IDProjectMWResourceStatus
957087Not reported5SolarActive
4598Not reported10SolarWithdrawn
4697Not reported10SolarWithdrawn
4698Not reported10SolarWithdrawn
4703Not reported10SolarWithdrawn
4732Not reported10SolarWithdrawn
4741Not reported10SolarWithdrawn
7638Not reported10SolarWithdrawn

Florence, SC: 17 requests in the Duke Energy queue, 6 active totaling 94.5 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2025 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first