OLANTA substation interconnection queue
2 active projects totaling 10 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
9 Duke Energy queue filings name OLANTA as the point of interconnection, all in Florence County, SC.
2active projects
10active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 4598 | Not reported | 230 | 10 | Solar | Withdrawn |
| 4697 | Not reported | 230 | 10 | Solar | Withdrawn |
| 4698 | Not reported | 230 | 10 | Solar | Withdrawn |
| 4703 | Not reported | 230 | 10 | Solar | Withdrawn |
| 4732 | Not reported | 230 | 10 | Solar | Withdrawn |
| 4741 | Not reported | 230 | 10 | Solar | Withdrawn |
| 7638 | Not reported | 230 | 10 | Solar | Withdrawn |
| 977864 | Not reported | 230 | 5 | Solar | Active |
| 957087 | Not reported | 230 | 5 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.