Duke Energy request 956532

Duke Energy queue ID 956532

Queue request 956532 was listed in the Duke Energy interconnection queue at the end of 2025 as a 4.5 MW solar project in Florence County, SC, according to Berkeley Lab’s queue data file. The filing names LAKE CITY as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID956532
Project nameNot reported
Status (as published)Active
SubstationLAKE CITY
Point of interconnectionLAKE CITY 230KV
CountyFlorence
StateSC
Voltage230 kV
Capacity4.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

LAKE CITY substation: 2 requests in the Duke Energy queue, 2 active totaling 9.5 MW.

Queue IDProjectMWResourceStatus
977876Not reported5SolarActive

Florence, SC: 17 requests in the Duke Energy queue, 6 active totaling 94.5 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2024 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 3 Cluster Study - Study Complete
Queue date2024-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.