Substation Scout

LAKE CITY substation interconnection queue

2 active projects totaling 9.5 MW in the Duke Energy queue.

2 Duke Energy queue filings name LAKE CITY as the point of interconnection, all in SC.

2active projects
9.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
977876 Not reported 230 5 Solar Active
956532 Not reported 230 4.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first