Substation Scout

Duke Energy request 569014

Duke Energy queue ID 569014

Queue request 569014 was listed in the Duke Energy interconnection queue at the end of 2025 as a 48 MW solar project in Kershaw County, SC, according to Berkeley Lab’s queue data file. The filing names ROBINSON PLANT - CAMDEN JUNCTION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 28, 2028.

Queue ID569014
Project nameNot reported
Status (as published)Active
SubstationROBINSON PLANT - CAMDEN JUNCTION
Point of interconnectionROBINSON PLANT - CAMDEN JUNCTION 115KV
CountyKershaw
StateSC
Voltage115 kV
Capacity48 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-07-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ROBINSON PLANT - CAMDEN JUNCTION substation: 6 requests in the Duke Energy queue, 2 active totaling 73 MW.

Queue IDProjectMWResourceStatus
957084Not reported25SolarActive
889981Not reported75SolarWithdrawn
916493Not reported75SolarWithdrawn
919085Not reported74.9SolarWithdrawn
918111Not reported60SolarWithdrawn

Kershaw, SC: 9 requests in the Duke Energy queue, 1 active totaling 48 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2022 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2022-06-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first