Kershaw, SC interconnection queue

1 active project totaling 48 MW in the Duke Energy queue, plus 8 with terminal status (shown grayed).

1active projects
48active MW
9total filed
Queue IDProjectkVMWResourceStatus
22180 Not reported 115 79.8 Solar Withdrawn
24078 Not reported 115 79.8 Solar Withdrawn
889981 Not reported 115 75 Solar Withdrawn
916493 Not reported 115 75 Solar Withdrawn
919085 Not reported 115 74.9 Solar Withdrawn
962924 Not reported 115 74.9 Solar Withdrawn
562906 Not reported 115 50 Solar Withdrawn
569014 Not reported 115 48 Solar Active
561400 Not reported 230 2.7 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.