ROBINSON PLANT - CAMDEN JUNCTION substation interconnection queue
2 active projects totaling 73 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).
6 Duke Energy queue filings name ROBINSON PLANT - CAMDEN JUNCTION as the point of interconnection, all in SC.
2active projects
73active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 889981 | Not reported | 115 | 75 | Solar | Withdrawn |
| 916493 | Not reported | 115 | 75 | Solar | Withdrawn |
| 919085 | Not reported | 115 | 74.9 | Solar | Withdrawn |
| 918111 | Not reported | 115 | 60 | Solar | Withdrawn |
| 569014 | Not reported | 115 | 48 | Solar | Active |
| 957084 | Not reported | 115 | 25 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner