Queue IDProjectkVMWResourceStatus
10 Not reported n/r 700 Gas Withdrawn
41 Not reported n/r 140 Nuclear Withdrawn
40 Not reported n/r 26 Nuclear Withdrawn
39 Not reported n/r 14 Nuclear Withdrawn
49 Not reported n/r 14 Coal Withdrawn
42 Not reported n/r 10 Coal Operational
43 Not reported n/r 10 Coal Operational
44 Not reported n/r 10 Coal Operational
45 Not reported n/r 10 Coal Operational
56 Not reported n/r 8 Coal Withdrawn
57 Not reported n/r 4 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first