Crystal River Substation substation interconnection queue
4 active projects totaling 40 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
11 Duke Energy queue filings name Crystal River Substation as the point of interconnection, all in Citrus County, FL.
4active projects
40active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 10 | Not reported | n/r | 700 | Gas | Withdrawn |
| 41 | Not reported | n/r | 140 | Nuclear | Withdrawn |
| 40 | Not reported | n/r | 26 | Nuclear | Withdrawn |
| 39 | Not reported | n/r | 14 | Nuclear | Withdrawn |
| 49 | Not reported | n/r | 14 | Coal | Withdrawn |
| 42 | Not reported | n/r | 10 | Coal | Operational |
| 43 | Not reported | n/r | 10 | Coal | Operational |
| 44 | Not reported | n/r | 10 | Coal | Operational |
| 45 | Not reported | n/r | 10 | Coal | Operational |
| 56 | Not reported | n/r | 8 | Coal | Withdrawn |
| 57 | Not reported | n/r | 4 | Coal | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.