Substation Scout

Duke Energy request 28

Duke Energy queue ID 28

Queue request 28 was listed in the Duke Energy interconnection queue at the end of 2025 as a 223 MW gas project in Pinellas County, FL, according to Berkeley Lab’s queue data file. The filing names Bartow Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2008.

Queue ID28
Project nameNot reported
Status (as published)Operational
SubstationBartow Substation
Point of interconnectionBartow Substation
CountyPinellas
StateFL
VoltageNot reported
Capacity223 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2008-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bartow Substation substation: 12 requests in the Duke Energy queue, 5 active totaling 1,310 MW.

Queue IDProjectMWResourceStatus
33Not reported418GasOperational
27Not reported223GasOperational
29Not reported223GasOperational
30Not reported223GasOperational
26Not reported500GasWithdrawn
34Not reported223GasWithdrawn
35Not reported223GasWithdrawn
64Not reported223GasWithdrawn
65Not reported223GasWithdrawn
36Not reported207GasWithdrawn
66Not reported207GasWithdrawn

Pinellas, FL: 14 requests in the Duke Energy queue, 7 active totaling 1,707 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2005-09-13
Operational date2009-06-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.