Bartow Substation substation interconnection queue

5 active projects totaling 1,310 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

12 Duke Energy queue filings name Bartow Substation as the point of interconnection, all in Pinellas County, FL.

5active projects
1,310active MW
12total filed
Queue IDProjectkVMWResourceStatus
26 Not reported n/r 500 Gas Withdrawn
33 Not reported n/r 418 Gas Operational
27 Not reported n/r 223 Gas Operational
28 Not reported n/r 223 Gas Operational
29 Not reported n/r 223 Gas Operational
30 Not reported n/r 223 Gas Operational
34 Not reported n/r 223 Gas Withdrawn
35 Not reported n/r 223 Gas Withdrawn
64 Not reported n/r 223 Gas Withdrawn
65 Not reported n/r 223 Gas Withdrawn
36 Not reported n/r 207 Gas Withdrawn
66 Not reported n/r 207 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.