Bartow Substation substation interconnection queue
5 active projects totaling 1,310 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
12 Duke Energy queue filings name Bartow Substation as the point of interconnection, all in Pinellas County, FL.
5active projects
1,310active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 26 | Not reported | n/r | 500 | Gas | Withdrawn |
| 33 | Not reported | n/r | 418 | Gas | Operational |
| 27 | Not reported | n/r | 223 | Gas | Operational |
| 28 | Not reported | n/r | 223 | Gas | Operational |
| 29 | Not reported | n/r | 223 | Gas | Operational |
| 30 | Not reported | n/r | 223 | Gas | Operational |
| 34 | Not reported | n/r | 223 | Gas | Withdrawn |
| 35 | Not reported | n/r | 223 | Gas | Withdrawn |
| 64 | Not reported | n/r | 223 | Gas | Withdrawn |
| 65 | Not reported | n/r | 223 | Gas | Withdrawn |
| 36 | Not reported | n/r | 207 | Gas | Withdrawn |
| 66 | Not reported | n/r | 207 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.