Substation Scout

Pinellas, FL interconnection queue

7 active projects totaling 1,707 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

7active projects
1,707active MW
14total filed
Queue IDProjectkVMWResourceStatus
26 Not reported n/r 500 Gas Withdrawn
33 Not reported n/r 418 Gas Operational
292 Not reported n/r 225 Battery Active
27 Not reported n/r 223 Gas Operational
28 Not reported n/r 223 Gas Operational
29 Not reported n/r 223 Gas Operational
30 Not reported n/r 223 Gas Operational
34 Not reported n/r 223 Gas Withdrawn
35 Not reported n/r 223 Gas Withdrawn
64 Not reported n/r 223 Gas Withdrawn
65 Not reported n/r 223 Gas Withdrawn
36 Not reported n/r 207 Gas Withdrawn
66 Not reported n/r 207 Gas Withdrawn
328 Not reported n/r 172 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first